Edit Quotation
Company Information
Reference ID: 2025GCB0010
Company Name
BAZY TRADING & CONTRACTING CO. LTD
Application Number
2025GCB0010
Quotation Number
GCB-2025-07-0007
Contact Person
Eng. Tarek Saleh
Address
Atiyah Al Fadani Street, Salauddin Al Ayoubi Road, Malaz, Riyadh, Saudi Arabia
Standards Selected
ISO 27001
ISO 20000
Currency
EGP (Egyptian Pound)
USD (US Dollar)
MYR (Malaysian Ringgit)
Man days Calculations
Detailed Man-days Calculation
ISO 27006-1:2024---> 20--> Table C.1 --> 7 ; ISO 20000-1:2018 ---> 20 --> QMS 1 --> 3 ; Total man-days for IMS = 7+3 = 10 ; Reduction:; Company has certified before for ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; The system are; — prior knowledge of the organization (e.g. if the organization has already been certified to another standard by the same certification body); — high client preparedness for certification (e.g. already certified or recognized by another third-party scheme); — high maturity of the management system in place. IAF MD 11:2023--> Audit will be based on fully integrated management system - Based on ISO 27006-1:2014 Table D.1 organization has Normal effort - Table D.2 --> factor related to business and organization 2+2+1 = 5 - Table D.3 --> IT environment ---> 2+1+1 = 4 - Table D.4 --> The impact factor on audit time = -5% to -10% = -10% - Man-days calculation = total reduction = -30% - Initial man-days calculation = 10*70% = 7 the 1st = 7 x 0.2 = 1.4;---> 1.5 the 2nd = 7 x 0.8 = 5.6 ; ---5.5 SV 1 = 7 x 0.3 = 2.1 ~ 2 SV 2 = ~ 2
Initial Certification Costs
Stage 1 Audit Cost
Stage 1 Man/days
Stage 2 Audit Cost
Stage 2 Man/days
Accommodation Cost
By GCB
By Client
Travel Cost
By GCB
By Client
Transportation Cost
By GCB
By Client
First Surveillance Visit Costs
Audit Cost
Man/days
Accommodation Cost
By GCB
By Client
Travel Cost
By GCB
By Client
Transportation Cost
By GCB
By Client
Second Surveillance Visit Costs
Audit Cost
Man/days
Accommodation Cost
By GCB
By Client
Travel Cost
By GCB
By Client
Transportation Cost
By GCB
By Client
Status
Pending
Approved
Rejected
In Case of Rejection, Please Provide Reason:
Client Approval
Quotation Date
Cancel
Save Changes
Saving changes...