Company Name
APEX FI GLOBAL FOR INSPECTION ENGINEERING SERVICES - L.L.C
Contact Person
Mohamed Karim Mohamed Ramy
nermine.hosny@apex-fi.com
Address
Al Hosn, West 7_1, 0: ~, Building, First Abu Dhabi Bank P.J.S.C., UAE
Scope
Pipelines Testing Services, industrial Facilities’ Installations, Inspection and Engineering services.
Quotation Date
24 Feb 2026
Application Number
2026GCB6638
Quotation Number
GCB-2026-02-0006
Client Status
Status
Approved
Reason for Non-Approval
| Description | Man-days | Payer | Cost (EGP) |
|---|---|---|---|
| Stage 1 Audit | 1.00 | - | EGP 8,000.00 |
| Stage 2 Audit | 4.00 | - | EGP 32,000.00 |
| Accommodation | - | By Client | EGP 0.00 |
| Travel | - | By Client | EGP 0.00 |
| Transportation | - | By Client | EGP 0.00 |
| Total Initial Certification Cost | EGP 40,000.00 | ||
|
Man-days Calculation
From IAF MD5 for 15 persons --> 2.5 man-day (1st +2nd stage) for QMS--table #1 From IAF MD 5 for 15 persons --> 3.5 man-day (1st + 2nd stage) for OHS -- table #3 Total man-days = 2.5+3.5 = 6 man-day since the System is full integrated and auditors are competent in the two standards Based on IAF MD 11 Reduction is [100*(2-1)]/[1*(2-1)] = 100% From figure 1 , the reduction is 20% The man-days after reduction = 6 x 80% = 4.8 man-days ~ 5 man-days 1st stage = 5 - 80% = 1 man-day 2nd stage = 5 - 20% = 4 man-days SV1 = 5 * (1/3) = 1.6 ~ 1.5 SV2 = 5 * (1/3) = 1.6 ~ 1.5 Recert = 5* (2/3) = 3.3 ~ 3.5 |
|||
| Description | Man-days | Payer | Cost (EGP) |
|---|---|---|---|
| Audit | 1.50 | - | EGP 12,000.00 |
| Accommodation | - | By Client | EGP 0.00 |
| Travel | - | By Client | EGP 0.00 |
| Transportation | - | By Client | EGP 0.00 |
| Total First Surveillance Visit Cost | EGP 12,000.00 | ||
| Description | Man-days | Payer | Cost (EGP) |
|---|---|---|---|
| Audit | 1.50 | - | EGP 12,000.00 |
| Accommodation | - | By Client | EGP 0.00 |
| Travel | - | By Client | EGP 0.00 |
| Transportation | - | By Client | EGP 0.00 |
| Total Second Surveillance Visit Cost | EGP 12,000.00 | ||
EGP 64,000.00