Corrective Action List

Audit Details for NEFERTITI MARINE


Audit Program Print Stage 2 Audit Plan Print Recertification Audit Plan Print SV1 Audit Plan Print SV2 Audit Plan Back
Decision Form

Organization Info

NameNEFERTITI MARINE
Address1 El Ferdous St. Smouha Alexandria,
Contact PersonEng. Karim Abd El Karim
Emailkarim@nefertitimarine.com
Audit CriteriaISO 9001
ScopeShip building & repair, Ship design and marine trading
EA CodeEA 20

Departments

Audit Program

NA

Audit Plans & Schedules

Plan Type: 1St Stage Audit Plan
Lead Auditor: Mohamed Abdellattif (M.A)
Technical Expert:
Team Members:
Audit Dates: 2025-08-09 to 2025-08-09
DateFromToActivity (Department)AuditorAuditee
2015-08-09 09:00:00 09:15:00 opening meeting M.A Quality manger
2025-08-09 09:15:00 09:45:00 clause 4.3 Scope of organization M.A Line manger
2025-08-09 09:45:00 10:15:00 clauses 4.1-4.2 Context of organization (Internal and external issues-needs and expectation of interested parties ) M.A Quality manger
2025-08-09 10:15:00 12:30:00 clauses 4.4-7-8 QMS system and its processes M.A Quality manger
2025-08-09 12:30:00 13:15:00 clauses 5.2- 6.1 policy - actions to address risks and opportunities M.A Quality manger
2025-08-09 13:15:00 13:45:00 Break
2025-08-09 13:45:00 14:30:00 clause 9.2 Internal Audit M.A Quality manger
2025-08-09 14:30:00 15:15:00 clause 9.3 Mangement Review M.A Quality manger
2025-08-09 15:15:00 16:00:00 Preparing the closed meeting M.A
2025-08-09 16:00:00 17:00:00 Closed Meeting M.A Line manger
Plan Type: Stage 2 Audit Plan
Lead Auditor: Mohamed Abdellattif (M.A)
Technical Expert:
Team Members: Adel Belal (Observer)
Audit Dates: 2025-08-13 to 2025-08-14
DateFromToActivity (Department)AuditorAuditee
0025-08-13 09:00:00 09:30:00 Opening Meeting M.A Line manger
2025-08-13 09:30:00 12:00:00 Ship design M.A design manager
2025-08-13 12:00:00 13:30:00 Break M.A
2025-08-13 13:30:00 14:30:00 Ship building M.A Production manager
2025-08-13 14:30:00 15:30:00 Ship repair M.A
2025-08-13 15:30:00 16:30:00 QC M.A Manager-Staff
2025-08-13 16:30:00 17:00:00 Stores M.A Manager-Staff
2025-08-13 17:00:00 17:15:00 Auditors meeting M.A Manager-Staff
2025-08-13 17:15:00 17:30:00 Washup meeting M.A Manager-Staff
2025-08-13 17:15:00 17:30:00 Washup meeting M.A Manager-Staff
2025-08-14 09:00:00 09:30:00 Recap M.A Line manger
2025-08-14 09:30:00 10:30:00 QA M.A Quality manger
2025-08-14 10:30:00 11:30:00 Purchasing M.A Manager-Staff
2025-08-14 11:30:00 12:30:00 Marine supplies (spare parts) M.A Manager-Staff
2025-08-14 12:30:00 13:00:00 Break M.A
2025-08-14 13:00:00 14:30:00 HR M.A HR manager
2025-08-14 14:30:00 14:45:00 Auditors meeting M.A Line Manger
2025-08-14 14:45:00 15:15:00 Washup meeting M.A Quality Manger
2025-08-14 15:15:00 15:45:00 Closing Meeting M.A Top Management

Audit Reports

1St Stage Print Edit
Type: 1St Stage
Lead Auditor: Mohamed Abdellattif (M.A)
Man Days: 1.0

Strength Point:
NA
Area for Improvement:
Enhancement of internal audit report (NM-QMS-P11-F04) dated 24/7/2025 is needed.
Observation:
1- Control of document information required to be performed in more details (external origin document) clause 7.5
2- Non-conformance report NCR (NM-QMS-P12-F01) dated 12/7/2025 not clarify deeply how the root cause be analyzed.
3- KPI for design process required to be more deterministic (Upper and Lower limits).
Minor NCR:
Major NCR:
NA
Team Leader Recommandations:
NEFERTITI MARINE has proven the readiness to go ahead in implementing stage-2 audit activities.
Audit Team:
  • Mohamed Abdellatif (Team leader)
  • Tarek Belal (Observer)
Auditees:
  • Mohammad Medhat (QA Engineer)
Findings
Clause No. Requirements/Departement Evidence Result
4.1 QA NM-QMS- P02-F01
External issues for example (class requirement), internal issues such as (employee competence) has been determined
Ok
4.2 QA NM-QMS- P02-F02
Interested parties (classification society) has been observed
Ok
4.3 QA NM-QMS
Quality manual has been reviewed
Ok
4.4 QA NM-QMS- P08
Design process sample has been monitored.
Ok
5.2 QA NM-QMS- P02-F01
Policy has been found to be cover the standard requirements.
Ok
5.3 QA NM-QMS- P05-F03
Authorities and responsibilities for example (job description) have been determined
Ok
6.1 QA NM-QMS- P02
3x3 matrix has been used for risk assessment
Ok
7.5 QA NM-QMS- P07-F01
Master document list has been established
Ok
8.4 QA NM-QMS- P13-F04
Supplier list for example (ESWECO) welding wire provider has been reviewed
Ok
8.4 QA NM-QMS- P13
Outsource procedures has been introduced
Ok
9.2 QA NM-QMS-P11
NM-QMS-P11-F01
NM-QMS-P11-F04
last internal audit dated17/7/2025 shows (1) minor NCR Non-compliance of employees’ files
Internal audit (procedure NM-QMS-P11, report (NM-QMS-P11-F04, program (NM-QMS-P11-F01) have been reviewed
Ok
9.3 QA NM-QMS-P14
NM-QMS-P14-F01
NM-QMS-P14-F02
NM-QMS-F02
Last M.R dated 28/7/2025 with frequency (1) year Mangement Review Procedure-Management Review Agenda-Management Review. Action Plan have been introduced.
Meeting Summary Report NM-QMS-F02 dated 28/7/2025 including the subjects and action required and the responsibilities have been provided.
Ok
6.2 QA NM-QMS-P03-F01
Quality objectives and follow up show some objectives such as develop number of naval architects and buy new software tools during the first quarter of 2026 and also Start the certification process for 14 welders by the end of 2025 the
Ok

Open Corrective Action Form
Stage 2 Audit Report Print Edit
Type: Stage 2 Audit Report
Lead Auditor: Mohamed Abdellattif (M.A)
Man Days: 2.0

Strength Point:
1- Full implementation of the Quality Management System (QMS) is evident and aligns with ISO 9001 requirements.
2- The management system is effective in achieving organizational quality objectives and demonstrating continual improvement.
3- Preventive and corrective actions are properly identified, documented, and followed up, showing proactive handling of nonconformities.
4-Compliance with all applicable statutory and regulatory requirements.
5-Risk-based thinking and opportunities for improvement are integrated into the system, promoting a culture of continuous improvement.
6-Evidence of strong leadership and commitment from top management in supporting and promoting the QMS.
Area for Improvement:
Root cause analysis deeply when address the issues without focusing only on symptoms.
Observation:
1-No clear evidence for pressure gauge calibration used during pressure test.
2- External provider selection criteria need to identify more clearly.
3- No clear evidence for QC qualification.
4- No clear evidence for level-2 certification related to visual inspection test (NDT)
Minor NCR:
NA
Major NCR:
NA
Team Leader Recommandations:
Nefertiti Company introduced sufficient evidence for providing ISO 9001 certification.
Audit Team:
  • Mohamed Abdellatif (Team Leader)
  • Adel Belal (Observer)
Auditees:
  • Eng.Karim (opening and closed meeting) (Managing Director)
  • Eng. Mohammad Medhat (opening and closed meeting) (QA Engineer)
  • Eng.Mohsen Ali Yehia (opening and closed meeting) (Technical Manager)
  • Eng. Reham Ezzat (opening and closed meeting) (QA Manager)
  • Eng. Mohab Ashraf (opening meeting) (Design Engineer)
  • Eng. Hesham Ahmed Said (opening meeting) (Project Manager)
  • Ebrahim Mohamed Hossen (Welder)
Findings
Clause No. Requirements/Departement Evidence Result
7.1.2,7.2 HR Training plan NM-QMS P05-F08
(4) training courses have been implemented for Eng. Mohab Ashraf (Construction-Piping and machinery for marine vessels-Rhino-Shipyard Technology) from July- September 2025.
OK
4.4-6.1,7.1.2.,7.2 8.3 Design department for KASID KHEIR Sample the following documents are reviewed to ensure design validation and verification in addition to methodology for design KPI calculation (one modification have been observed for 22 total drawing.

1- Design Procedure NM-QMS- P08.including design validation - verification responsibilities and criteria of KPI calculation .
2-Design Plan NM-QMS-P08-
F01
3- Design Input Checklist NM-
QMS-P08-F02.including all customer requirements and list of drawing needed .
4- Design Change Request
NM-QMS-P08-F04 include production feedback as an origin for change request dated 18/3/2025 - 2 drawings will be affected in hull construction (N25-50MPONTOON-007-N25-50MPONTOON-005) change has been approved by Moustafa Khamis as Design Lead and Karim Abdel-Karim as Managing Director .
Maxsurf software 2021 have been used in design validation while Rhino -7 software 2020 is used for design verification process.
5- design risks have been established NM-QMS-P02-F03 risk register two risks are observed (Critical Structural or Stability Miscalculations with Implement a peer review system for all structural and stability calculations by the design lead corrective action) also another risk (Non-Compliance with Maritime Regulations or Classification Rules) with Maintain and regularly update a regulatory requirements database corrective action.
6- N25-50m PONTOON-015 DWG have been checked designed by Eng. Habiba salah-checked byEng.Moustfa Khamis-Approved by Eng. Karim Abd EL Karim .no design review has been done.
OK
8.4,4.1,4.2, 4.4,6.1 Purchasing the following purchasing documents have been reviewed.
1-Approved vendor list NM-
QMS-P13-F04 has been reviewed with 25 local vendor for example ELHAMD company supplier.
2-Supplier evaluation NM-
QMS-P13-F03 has been checked for example ESWECO for welding electrode delivery.
3- one risk has been established NM-QMS-P02-F03 risk register (Delay in steel delivery from Sole supplier) with corrective action Use early procurement planning during the project kickoff stage.
4-NM-QMS-P13-F02 Purchase Order (P.O) Supplier Name-ESWECO for 6 different welding electrode dated 21/7/2025.
OK
8.5,4.1,4.2, 4.,6.1 Ship building
for KASID KHEIR Sample
1- NDT NM-QMS - P15-F04 visual inspection test report including 6 welding process in 6 different sections for midship section with accepted results .test date 7/4/2025.
2- NM-QMS-P15-F05
Pressure test log dated 9/4/2025 for 21 tank with no observation for (leak/drop)-test type pneumatic test.
3- Work Instructions NM-
QMS-P15-W01.
4- Asset Register &
Maintenance Plan NM-
QMS-P06-F01.
5- Production procedures NM-
QMS-P15.
6- two risks have been
observed in risk register NM-
QMS-P02-F03.

OK
7.2,8.5.2,8.5.4 Warehouse 2- delivery request NM-P04-
F03.four different materials have been requested through production department dated 9/8/2025.
3-Warehouse Management
Procedure NM-QMS-P04.
welding electrode have been
checked with:
batch no sqy210520-30
Manfacturing date 15/06/2024.
4- Warehouse Keeper
Competency NM-QMS-P05-F21 has been checked .Employee Mohamed Zaghloul assessment dated 23/7/2025 is observed .Technical Competency Checklist was reviewed .the employee has meets minimum competency requirements and therefore no need for additional training. the evaluation was approved with Eng. Hesham Ahmed (Project Manager).
OK
8.5 Ship Repair Maintenance works for the hull of Al-Jabbarah (13) has been issued from ELNASR company for building and construction with total (33)requirement .date 25/8/2025. OK
9.2,9.3 QA 1- NM-QMS-F02 Meeting Summary Report dated 28/7/2025 including (Review of Internal audit results-Customer feedback on KASED KHAIR B2 and
MONSOON projects-Process performance and production
delays-Status of nonconformities and corrective
actions-Review of supplier performance and delivery
delays-Evaluation of resource needs (equipment –
manpower)-Risk and opportunity updates-Quality objectives progress – 1st and 2nd
quarter).Action required for each topic has been documented.attendance 1.
Eng. Karim Abd El Karim
2. E
ng. Nader Abd El Karim
3.
Eng. Mohsen Ali
4.
Eng. Reham
Ezzat
5.
Eng. Mohammad Medhat
2- Internal audit report NM-QMS-P11-F04 dated 10/7/2025 including (1) NCR (HR) département.
OK
9.1 QC 1- NDT NM-QMS - P15-F04 visual inspection test report including 6 welding process in 6 different sections for midship section with accepted results .test date 7/4/2025.
2- NM-QMS-P15-F05
Pressure test log dated 9/4/2025 for 21 tank with no observation for (leak/drop)-test type pneumatic test.
3-Thordon propeller shaft bearing installation report NM-QMS-P09-F06 dated 15/4/2025 accepted by Eng. Mostafa Ragab
OK
8.2 Marine supplies. Thordon Propeller Shaft Bearing Installation Report. NM-QMS-P09-F06
1. Date of Installation:
2. Thordon Distributor:
15/04/2025
NEFERTITI MARINE
3. Location (Shipyard/Dock):
SUMED
Bearing Installation Acceptance
Date of Arrival: 14/04/2025
Date of Release: 15/04/2025
Accepted by: Eng. Mostafa Ragab

OK

Open Corrective Action Form
Recertification Audit Report Add Report
No audit report recorded for this plan type.
SV1 Audit Report Add Report
No audit report recorded for this plan type.
SV2 Audit Report Add Report
No audit report recorded for this plan type.